Klasse DualGanttChartLiteContainer
java.lang.Object
javafx.scene.Node
javafx.scene.Parent
javafx.scene.layout.Region
javafx.scene.control.Control
com.flexganttfx.view.util.FlexGanttFXControl
com.flexganttfx.view.container.ContainerBase<GanttChartLite<?>>
com.flexganttfx.view.container.DualGanttChartContainerBase<GanttChartLite<?>>
com.flexganttfx.view.container.DualGanttChartLiteContainer
- Alle implementierten Schnittstellen:
Styleable, EventTarget, Skinnable
A specialization of
DualGanttChartContainerBase capable of displaying
exactly two instances of GanttChartLite and keeping their layouts (e.g.,
same timeline) and their scrolling and zooming behavior in
sync. The container distinguishes between a primary and a secondary Gantt
chart, where the secondary Gantt chart is located in the detail node section
of a MasterDetailPane. It can be hidden or shown on demand. Each one
of the two Gantt charts can have its own header and footer.
- Seit:
- 1.6
-
Eigenschaftsübersicht
Von Klasse geerbte Eigenschaften DualGanttChartContainerBase
primaryFooter, primaryGanttChart, primaryHeader, secondaryFooter, secondaryGanttChart, secondaryHeader, showSecondaryVon Klasse geerbte Eigenschaften Control
contextMenu, skin, tooltipVon Klasse geerbte Eigenschaften Region
background, border, cacheShape, centerShape, height, insets, maxHeight, maxWidth, minHeight, minWidth, opaqueInsets, padding, prefHeight, prefWidth, scaleShape, shape, snapToPixel, widthVon Klasse geerbte Eigenschaften Parent
needsLayoutVon Klasse geerbte Eigenschaften Node
accessibleHelp, accessibleRoleDescription, accessibleRole, accessibleText, blendMode, boundsInLocal, boundsInParent, cacheHint, cache, clip, cursor, depthTest, disabled, disable, effectiveNodeOrientation, effect, eventDispatcher, focused, focusTraversable, hover, id, inputMethodRequests, layoutBounds, layoutX, layoutY, localToParentTransform, localToSceneTransform, managed, mouseTransparent, nodeOrientation, onContextMenuRequested, onDragDetected, onDragDone, onDragDropped, onDragEntered, onDragExited, onDragOver, onInputMethodTextChanged, onKeyPressed, onKeyReleased, onKeyTyped, onMouseClicked, onMouseDragEntered, onMouseDragExited, onMouseDragged, onMouseDragOver, onMouseDragReleased, onMouseEntered, onMouseExited, onMouseMoved, onMousePressed, onMouseReleased, onRotate, onRotationFinished, onRotationStarted, onScrollFinished, onScroll, onScrollStarted, onSwipeDown, onSwipeLeft, onSwipeRight, onSwipeUp, onTouchMoved, onTouchPressed, onTouchReleased, onTouchStationary, onZoomFinished, onZoom, onZoomStarted, opacity, parent, pickOnBounds, pressed, rotate, rotationAxis, scaleX, scaleY, scaleZ, scene, style, translateX, translateY, translateZ, viewOrder, visible -
Feldübersicht
Von Klasse geerbte Felder Region
USE_COMPUTED_SIZE, USE_PREF_SIZEVon Klasse geerbte Felder Node
BASELINE_OFFSET_SAME_AS_HEIGHT -
Konstruktorübersicht
KonstruktorenKonstruktorBeschreibungConstructs a new container.DualGanttChartLiteContainer(boolean autoBinding) Constructs a new container.DualGanttChartLiteContainer(boolean autoBinding, GanttChartLite<?> primaryGanttChart, GanttChartLite<?> secondaryGanttChart) Constructs a new container with the given graphics controls.DualGanttChartLiteContainer(GanttChartLite<?> primaryGanttChart, GanttChartLite<?> secondaryGanttChart) Constructs a new container with the given graphics controls. -
Methodenübersicht
Von Klasse geerbte Methoden DualGanttChartContainerBase
createDefaultSkin, getMasterDetailPane, getPrimaryFooter, getPrimaryGanttChart, getPrimaryHeader, getSecondaryFooter, getSecondaryGanttChart, getSecondaryHeader, getUserAgentStylesheet, isShowSecondary, primaryFooterProperty, primaryGanttChartProperty, primaryHeaderProperty, secondaryFooterProperty, secondaryGanttChartProperty, secondaryHeaderProperty, setPrimaryFooter, setPrimaryGanttChart, setPrimaryHeader, setSecondaryFooter, setSecondaryGanttChart, setSecondaryHeader, setShowSecondary, showSecondaryPropertyVon Klasse geerbte Methoden ContainerBase
getGanttCharts, isAutoBindingVon Klasse geerbte Methoden FlexGanttFXControl
getUserAgentStylesheetVon Klasse geerbte Methoden Control
computeMaxHeight, computeMaxWidth, computeMinHeight, computeMinWidth, computePrefHeight, computePrefWidth, contextMenuProperty, executeAccessibleAction, getBaselineOffset, getClassCssMetaData, getContextMenu, getControlCssMetaData, getCssMetaData, getInitialFocusTraversable, getSkin, getTooltip, isResizable, layoutChildren, queryAccessibleAttribute, setContextMenu, setSkin, setTooltip, skinProperty, tooltipPropertyVon Klasse geerbte Methoden Region
backgroundProperty, borderProperty, cacheShapeProperty, centerShapeProperty, getBackground, getBorder, getHeight, getInsets, getMaxHeight, getMaxWidth, getMinHeight, getMinWidth, getOpaqueInsets, getPadding, getPrefHeight, getPrefWidth, getShape, getWidth, heightProperty, insetsProperty, isCacheShape, isCenterShape, isScaleShape, isSnapToPixel, layoutInArea, layoutInArea, layoutInArea, layoutInArea, maxHeight, maxHeightProperty, maxWidth, maxWidthProperty, minHeight, minHeightProperty, minWidth, minWidthProperty, opaqueInsetsProperty, paddingProperty, positionInArea, positionInArea, prefHeight, prefHeightProperty, prefWidth, prefWidthProperty, resize, scaleShapeProperty, setBackground, setBorder, setCacheShape, setCenterShape, setHeight, setMaxHeight, setMaxSize, setMaxWidth, setMinHeight, setMinSize, setMinWidth, setOpaqueInsets, setPadding, setPrefHeight, setPrefSize, setPrefWidth, setScaleShape, setShape, setSnapToPixel, setWidth, shapeProperty, snappedBottomInset, snappedLeftInset, snappedRightInset, snappedTopInset, snapPosition, snapPositionX, snapPositionY, snapSize, snapSizeX, snapSizeY, snapSpace, snapSpaceX, snapSpaceY, snapToPixelProperty, widthPropertyVon Klasse geerbte Methoden Parent
getChildren, getChildrenUnmodifiable, getManagedChildren, getStylesheets, isNeedsLayout, layout, lookup, needsLayoutProperty, requestLayout, requestParentLayout, setNeedsLayout, updateBoundsVon Klasse geerbte Methoden Node
accessibleHelpProperty, accessibleRoleDescriptionProperty, accessibleRoleProperty, accessibleTextProperty, addEventFilter, addEventHandler, applyCss, autosize, blendModeProperty, boundsInLocalProperty, boundsInParentProperty, buildEventDispatchChain, cacheHintProperty, cacheProperty, clipProperty, computeAreaInScreen, contains, contains, cursorProperty, depthTestProperty, disabledProperty, disableProperty, effectiveNodeOrientationProperty, effectProperty, eventDispatcherProperty, fireEvent, focusedProperty, focusTraversableProperty, getAccessibleHelp, getAccessibleRole, getAccessibleRoleDescription, getAccessibleText, getBlendMode, getBoundsInLocal, getBoundsInParent, getCacheHint, getClip, getContentBias, getCursor, getDepthTest, getEffect, getEffectiveNodeOrientation, getEventDispatcher, getId, getInitialCursor, getInputMethodRequests, getLayoutBounds, getLayoutX, getLayoutY, getLocalToParentTransform, getLocalToSceneTransform, getNodeOrientation, getOnContextMenuRequested, getOnDragDetected, getOnDragDone, getOnDragDropped, getOnDragEntered, getOnDragExited, getOnDragOver, getOnInputMethodTextChanged, getOnKeyPressed, getOnKeyReleased, getOnKeyTyped, getOnMouseClicked, getOnMouseDragEntered, getOnMouseDragExited, getOnMouseDragged, getOnMouseDragOver, getOnMouseDragReleased, getOnMouseEntered, getOnMouseExited, getOnMouseMoved, getOnMousePressed, getOnMouseReleased, getOnRotate, getOnRotationFinished, getOnRotationStarted, getOnScroll, getOnScrollFinished, getOnScrollStarted, getOnSwipeDown, getOnSwipeLeft, getOnSwipeRight, getOnSwipeUp, getOnTouchMoved, getOnTouchPressed, getOnTouchReleased, getOnTouchStationary, getOnZoom, getOnZoomFinished, getOnZoomStarted, getOpacity, getParent, getProperties, getPseudoClassStates, getRotate, getRotationAxis, getScaleX, getScaleY, getScaleZ, getScene, getStyle, getStyleableParent, getStyleClass, getTransforms, getTranslateX, getTranslateY, getTranslateZ, getTypeSelector, getUserData, getViewOrder, hasProperties, hoverProperty, idProperty, inputMethodRequestsProperty, intersects, intersects, isCache, isDisable, isDisabled, isFocused, isFocusTraversable, isHover, isManaged, isMouseTransparent, isPickOnBounds, isPressed, isVisible, layoutBoundsProperty, layoutXProperty, layoutYProperty, localToParent, localToParent, localToParent, localToParent, localToParent, localToParentTransformProperty, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToSceneTransformProperty, localToScreen, localToScreen, localToScreen, localToScreen, localToScreen, lookupAll, managedProperty, mouseTransparentProperty, nodeOrientationProperty, notifyAccessibleAttributeChanged, onContextMenuRequestedProperty, onDragDetectedProperty, onDragDoneProperty, onDragDroppedProperty, onDragEnteredProperty, onDragExitedProperty, onDragOverProperty, onInputMethodTextChangedProperty, onKeyPressedProperty, onKeyReleasedProperty, onKeyTypedProperty, onMouseClickedProperty, onMouseDragEnteredProperty, onMouseDragExitedProperty, onMouseDraggedProperty, onMouseDragOverProperty, onMouseDragReleasedProperty, onMouseEnteredProperty, onMouseExitedProperty, onMouseMovedProperty, onMousePressedProperty, onMouseReleasedProperty, onRotateProperty, onRotationFinishedProperty, onRotationStartedProperty, onScrollFinishedProperty, onScrollProperty, onScrollStartedProperty, onSwipeDownProperty, onSwipeLeftProperty, onSwipeRightProperty, onSwipeUpProperty, onTouchMovedProperty, onTouchPressedProperty, onTouchReleasedProperty, onTouchStationaryProperty, onZoomFinishedProperty, onZoomProperty, onZoomStartedProperty, opacityProperty, parentProperty, parentToLocal, parentToLocal, parentToLocal, parentToLocal, parentToLocal, pickOnBoundsProperty, pressedProperty, pseudoClassStateChanged, relocate, removeEventFilter, removeEventHandler, requestFocus, resizeRelocate, rotateProperty, rotationAxisProperty, scaleXProperty, scaleYProperty, scaleZProperty, sceneProperty, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, screenToLocal, screenToLocal, screenToLocal, setAccessibleHelp, setAccessibleRole, setAccessibleRoleDescription, setAccessibleText, setBlendMode, setCache, setCacheHint, setClip, setCursor, setDepthTest, setDisable, setDisabled, setEffect, setEventDispatcher, setEventHandler, setFocused, setFocusTraversable, setHover, setId, setInputMethodRequests, setLayoutX, setLayoutY, setManaged, setMouseTransparent, setNodeOrientation, setOnContextMenuRequested, setOnDragDetected, setOnDragDone, setOnDragDropped, setOnDragEntered, setOnDragExited, setOnDragOver, setOnInputMethodTextChanged, setOnKeyPressed, setOnKeyReleased, setOnKeyTyped, setOnMouseClicked, setOnMouseDragEntered, setOnMouseDragExited, setOnMouseDragged, setOnMouseDragOver, setOnMouseDragReleased, setOnMouseEntered, setOnMouseExited, setOnMouseMoved, setOnMousePressed, setOnMouseReleased, setOnRotate, setOnRotationFinished, setOnRotationStarted, setOnScroll, setOnScrollFinished, setOnScrollStarted, setOnSwipeDown, setOnSwipeLeft, setOnSwipeRight, setOnSwipeUp, setOnTouchMoved, setOnTouchPressed, setOnTouchReleased, setOnTouchStationary, setOnZoom, setOnZoomFinished, setOnZoomStarted, setOpacity, setPickOnBounds, setPressed, setRotate, setRotationAxis, setScaleX, setScaleY, setScaleZ, setStyle, setTranslateX, setTranslateY, setTranslateZ, setUserData, setViewOrder, setVisible, snapshot, snapshot, startDragAndDrop, startFullDrag, styleProperty, toBack, toFront, toString, translateXProperty, translateYProperty, translateZProperty, usesMirroring, viewOrderProperty, visiblePropertyVon Klasse geerbte Methoden Object
clone, equals, finalize, getClass, hashCode, notify, notifyAll, wait, wait, waitVon Schnittstelle geerbte Methoden Styleable
getStyleableNode
-
Konstruktordetails
-
DualGanttChartLiteContainer
public DualGanttChartLiteContainer(boolean autoBinding, GanttChartLite<?> primaryGanttChart, GanttChartLite<?> secondaryGanttChart) Constructs a new container with the given graphics controls.- Parameter:
autoBinding- if true, many properties of the secondary control will be bound to their equivalent of the primary graphics chartprimaryGanttChart- the primary graphics shown in the top positionsecondaryGanttChart- the secondary graphics shown in the bottom position- Seit:
- 1.6
-
DualGanttChartLiteContainer
public DualGanttChartLiteContainer(GanttChartLite<?> primaryGanttChart, GanttChartLite<?> secondaryGanttChart) Constructs a new container with the given graphics controls. The properties of the secondary graphics will be bound to their equivalent of the primary graphics.- Parameter:
primaryGanttChart- the primary graphics shown in the top positionsecondaryGanttChart- the secondary graphics shown in the bottom position- Seit:
- 1.6
-
DualGanttChartLiteContainer
public DualGanttChartLiteContainer(boolean autoBinding) Constructs a new container. GanttChartLite must be added by callingDualGanttChartContainerBase.setPrimaryGanttChart(GanttChartBase)andDualGanttChartContainerBase.setSecondaryGanttChart(GanttChartBase).- Parameter:
autoBinding- if true, many properties of the secondary graphics will be bound to their equivalent of the primary graphics- Seit:
- 1.6
-
DualGanttChartLiteContainer
public DualGanttChartLiteContainer()Constructs a new container. GanttChartLite must be added by callingDualGanttChartContainerBase.setPrimaryGanttChart(GanttChartBase)andDualGanttChartContainerBase.setSecondaryGanttChart(GanttChartBase). The properties of the secondary graphics will be bound to their equivalent of the primary graphics.- Seit:
- 1.6
-