Klasse QuadGanttChartContainer
java.lang.Object
javafx.scene.Node
javafx.scene.Parent
javafx.scene.layout.Region
javafx.scene.control.Control
com.flexganttfx.view.util.FlexGanttFXControl
com.flexganttfx.view.container.ContainerBase<GanttChart<?>>
com.flexganttfx.view.container.QuadGanttChartContainerBase<GanttChart<?>>
com.flexganttfx.view.container.QuadGanttChartContainer
- Alle implementierten Schnittstellen:
Styleable, EventTarget, Skinnable
A specialization of 
QuadGanttChartContainerBase capable of displaying
exactly four instances of GanttChart and keeping their layouts (same
table width, same timeline) and their scrolling and zooming behavior in
sync. The container distinguishes between four Gantt chart locations, where the
right and the lower Gantt charts are located in the detail node sections
of several MasterDetailPane instances. They can be hidden or shown on
demand. Each one of the four Gantt charts can have its own header and footer.
The screenshot below shows the initial appearance of an empty Quad Gantt
chart container control.

- Seit:
- 1.6
-
Eigenschaftsübersicht
Von Klasse geerbte Eigenschaften QuadGanttChartContainerBase
animated, lowerLeftFooter, lowerLeftGanttChart, lowerLeftHeader, lowerRightFooter, lowerRightGanttChart, lowerRightHeader, showLower, upperLeftFooter, upperLeftGanttChart, upperLeftHeader, upperRightFooter, upperRightGanttChart, upperRightHeaderVon Klasse geerbte Eigenschaften Control
contextMenu, skin, tooltipVon Klasse geerbte Eigenschaften Region
background, border, cacheShape, centerShape, height, insets, maxHeight, maxWidth, minHeight, minWidth, opaqueInsets, padding, prefHeight, prefWidth, scaleShape, shape, snapToPixel, widthVon Klasse geerbte Eigenschaften Parent
needsLayoutVon Klasse geerbte Eigenschaften Node
accessibleHelp, accessibleRoleDescription, accessibleRole, accessibleText, blendMode, boundsInLocal, boundsInParent, cacheHint, cache, clip, cursor, depthTest, disabled, disable, effectiveNodeOrientation, effect, eventDispatcher, focused, focusTraversable, hover, id, inputMethodRequests, layoutBounds, layoutX, layoutY, localToParentTransform, localToSceneTransform, managed, mouseTransparent, nodeOrientation, onContextMenuRequested, onDragDetected, onDragDone, onDragDropped, onDragEntered, onDragExited, onDragOver, onInputMethodTextChanged, onKeyPressed, onKeyReleased, onKeyTyped, onMouseClicked, onMouseDragEntered, onMouseDragExited, onMouseDragged, onMouseDragOver, onMouseDragReleased, onMouseEntered, onMouseExited, onMouseMoved, onMousePressed, onMouseReleased, onRotate, onRotationFinished, onRotationStarted, onScrollFinished, onScroll, onScrollStarted, onSwipeDown, onSwipeLeft, onSwipeRight, onSwipeUp, onTouchMoved, onTouchPressed, onTouchReleased, onTouchStationary, onZoomFinished, onZoom, onZoomStarted, opacity, parent, pickOnBounds, pressed, rotate, rotationAxis, scaleX, scaleY, scaleZ, scene, style, translateX, translateY, translateZ, viewOrder, visible -
Feldübersicht
Von Klasse geerbte Felder Region
USE_COMPUTED_SIZE, USE_PREF_SIZEVon Klasse geerbte Felder Node
BASELINE_OFFSET_SAME_AS_HEIGHT -
Konstruktorübersicht
KonstruktorenKonstruktorBeschreibungConstructs a new container.QuadGanttChartContainer(GanttChart<?> upperLeft, GanttChart<?> upperRight, GanttChart<?> lowerLeft, GanttChart<?> lowerRight) Constructs a new container with the given Gantt chart controls. -
Methodenübersicht
Von Klasse geerbte Methoden QuadGanttChartContainerBase
animatedProperty, createDefaultSkin, getLowerLeftFooter, getLowerLeftGanttChart, getLowerLeftHeader, getLowerMasterDetailPane, getLowerRightFooter, getLowerRightGanttChart, getLowerRightHeader, getUpperLeftFooter, getUpperLeftGanttChart, getUpperLeftHeader, getUpperLowerMasterDetailPane, getUpperMasterDetailPane, getUpperRightFooter, getUpperRightGanttChart, getUpperRightHeader, getUserAgentStylesheet, isAnimated, isShowLower, lowerLeftFooterProperty, lowerLeftGanttChartProperty, lowerLeftHeaderProperty, lowerRightFooterProperty, lowerRightGanttChartProperty, lowerRightHeaderProperty, setAnimated, setLowerLeftFooter, setLowerLeftGanttChart, setLowerLeftHeader, setLowerRightFooter, setLowerRightGanttChart, setLowerRightHeader, setShowLower, setUpperLeftFooter, setUpperLeftGanttChart, setUpperLeftHeader, setUpperRightFooter, setUpperRightGanttChart, setUpperRightHeader, showAllFour, showHorizontalSplitScreen, showLowerProperty, showSingleChart, showVerticalSplitScreen, upperLeftFooterProperty, upperLeftGanttChartProperty, upperLeftHeaderProperty, upperRightFooterProperty, upperRightGanttChartProperty, upperRightHeaderPropertyVon Klasse geerbte Methoden ContainerBase
getGanttCharts, isAutoBindingVon Klasse geerbte Methoden FlexGanttFXControl
getUserAgentStylesheetVon Klasse geerbte Methoden Control
computeMaxHeight, computeMaxWidth, computeMinHeight, computeMinWidth, computePrefHeight, computePrefWidth, contextMenuProperty, executeAccessibleAction, getBaselineOffset, getClassCssMetaData, getContextMenu, getControlCssMetaData, getCssMetaData, getInitialFocusTraversable, getSkin, getTooltip, isResizable, layoutChildren, queryAccessibleAttribute, setContextMenu, setSkin, setTooltip, skinProperty, tooltipPropertyVon Klasse geerbte Methoden Region
backgroundProperty, borderProperty, cacheShapeProperty, centerShapeProperty, getBackground, getBorder, getHeight, getInsets, getMaxHeight, getMaxWidth, getMinHeight, getMinWidth, getOpaqueInsets, getPadding, getPrefHeight, getPrefWidth, getShape, getWidth, heightProperty, insetsProperty, isCacheShape, isCenterShape, isScaleShape, isSnapToPixel, layoutInArea, layoutInArea, layoutInArea, layoutInArea, maxHeight, maxHeightProperty, maxWidth, maxWidthProperty, minHeight, minHeightProperty, minWidth, minWidthProperty, opaqueInsetsProperty, paddingProperty, positionInArea, positionInArea, prefHeight, prefHeightProperty, prefWidth, prefWidthProperty, resize, scaleShapeProperty, setBackground, setBorder, setCacheShape, setCenterShape, setHeight, setMaxHeight, setMaxSize, setMaxWidth, setMinHeight, setMinSize, setMinWidth, setOpaqueInsets, setPadding, setPrefHeight, setPrefSize, setPrefWidth, setScaleShape, setShape, setSnapToPixel, setWidth, shapeProperty, snappedBottomInset, snappedLeftInset, snappedRightInset, snappedTopInset, snapPosition, snapPositionX, snapPositionY, snapSize, snapSizeX, snapSizeY, snapSpace, snapSpaceX, snapSpaceY, snapToPixelProperty, widthPropertyVon Klasse geerbte Methoden Parent
getChildren, getChildrenUnmodifiable, getManagedChildren, getStylesheets, isNeedsLayout, layout, lookup, needsLayoutProperty, requestLayout, requestParentLayout, setNeedsLayout, updateBoundsVon Klasse geerbte Methoden Node
accessibleHelpProperty, accessibleRoleDescriptionProperty, accessibleRoleProperty, accessibleTextProperty, addEventFilter, addEventHandler, applyCss, autosize, blendModeProperty, boundsInLocalProperty, boundsInParentProperty, buildEventDispatchChain, cacheHintProperty, cacheProperty, clipProperty, computeAreaInScreen, contains, contains, cursorProperty, depthTestProperty, disabledProperty, disableProperty, effectiveNodeOrientationProperty, effectProperty, eventDispatcherProperty, fireEvent, focusedProperty, focusTraversableProperty, getAccessibleHelp, getAccessibleRole, getAccessibleRoleDescription, getAccessibleText, getBlendMode, getBoundsInLocal, getBoundsInParent, getCacheHint, getClip, getContentBias, getCursor, getDepthTest, getEffect, getEffectiveNodeOrientation, getEventDispatcher, getId, getInitialCursor, getInputMethodRequests, getLayoutBounds, getLayoutX, getLayoutY, getLocalToParentTransform, getLocalToSceneTransform, getNodeOrientation, getOnContextMenuRequested, getOnDragDetected, getOnDragDone, getOnDragDropped, getOnDragEntered, getOnDragExited, getOnDragOver, getOnInputMethodTextChanged, getOnKeyPressed, getOnKeyReleased, getOnKeyTyped, getOnMouseClicked, getOnMouseDragEntered, getOnMouseDragExited, getOnMouseDragged, getOnMouseDragOver, getOnMouseDragReleased, getOnMouseEntered, getOnMouseExited, getOnMouseMoved, getOnMousePressed, getOnMouseReleased, getOnRotate, getOnRotationFinished, getOnRotationStarted, getOnScroll, getOnScrollFinished, getOnScrollStarted, getOnSwipeDown, getOnSwipeLeft, getOnSwipeRight, getOnSwipeUp, getOnTouchMoved, getOnTouchPressed, getOnTouchReleased, getOnTouchStationary, getOnZoom, getOnZoomFinished, getOnZoomStarted, getOpacity, getParent, getProperties, getPseudoClassStates, getRotate, getRotationAxis, getScaleX, getScaleY, getScaleZ, getScene, getStyle, getStyleableParent, getStyleClass, getTransforms, getTranslateX, getTranslateY, getTranslateZ, getTypeSelector, getUserData, getViewOrder, hasProperties, hoverProperty, idProperty, inputMethodRequestsProperty, intersects, intersects, isCache, isDisable, isDisabled, isFocused, isFocusTraversable, isHover, isManaged, isMouseTransparent, isPickOnBounds, isPressed, isVisible, layoutBoundsProperty, layoutXProperty, layoutYProperty, localToParent, localToParent, localToParent, localToParent, localToParent, localToParentTransformProperty, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToScene, localToSceneTransformProperty, localToScreen, localToScreen, localToScreen, localToScreen, localToScreen, lookupAll, managedProperty, mouseTransparentProperty, nodeOrientationProperty, notifyAccessibleAttributeChanged, onContextMenuRequestedProperty, onDragDetectedProperty, onDragDoneProperty, onDragDroppedProperty, onDragEnteredProperty, onDragExitedProperty, onDragOverProperty, onInputMethodTextChangedProperty, onKeyPressedProperty, onKeyReleasedProperty, onKeyTypedProperty, onMouseClickedProperty, onMouseDragEnteredProperty, onMouseDragExitedProperty, onMouseDraggedProperty, onMouseDragOverProperty, onMouseDragReleasedProperty, onMouseEnteredProperty, onMouseExitedProperty, onMouseMovedProperty, onMousePressedProperty, onMouseReleasedProperty, onRotateProperty, onRotationFinishedProperty, onRotationStartedProperty, onScrollFinishedProperty, onScrollProperty, onScrollStartedProperty, onSwipeDownProperty, onSwipeLeftProperty, onSwipeRightProperty, onSwipeUpProperty, onTouchMovedProperty, onTouchPressedProperty, onTouchReleasedProperty, onTouchStationaryProperty, onZoomFinishedProperty, onZoomProperty, onZoomStartedProperty, opacityProperty, parentProperty, parentToLocal, parentToLocal, parentToLocal, parentToLocal, parentToLocal, pickOnBoundsProperty, pressedProperty, pseudoClassStateChanged, relocate, removeEventFilter, removeEventHandler, requestFocus, resizeRelocate, rotateProperty, rotationAxisProperty, scaleXProperty, scaleYProperty, scaleZProperty, sceneProperty, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, sceneToLocal, screenToLocal, screenToLocal, screenToLocal, setAccessibleHelp, setAccessibleRole, setAccessibleRoleDescription, setAccessibleText, setBlendMode, setCache, setCacheHint, setClip, setCursor, setDepthTest, setDisable, setDisabled, setEffect, setEventDispatcher, setEventHandler, setFocused, setFocusTraversable, setHover, setId, setInputMethodRequests, setLayoutX, setLayoutY, setManaged, setMouseTransparent, setNodeOrientation, setOnContextMenuRequested, setOnDragDetected, setOnDragDone, setOnDragDropped, setOnDragEntered, setOnDragExited, setOnDragOver, setOnInputMethodTextChanged, setOnKeyPressed, setOnKeyReleased, setOnKeyTyped, setOnMouseClicked, setOnMouseDragEntered, setOnMouseDragExited, setOnMouseDragged, setOnMouseDragOver, setOnMouseDragReleased, setOnMouseEntered, setOnMouseExited, setOnMouseMoved, setOnMousePressed, setOnMouseReleased, setOnRotate, setOnRotationFinished, setOnRotationStarted, setOnScroll, setOnScrollFinished, setOnScrollStarted, setOnSwipeDown, setOnSwipeLeft, setOnSwipeRight, setOnSwipeUp, setOnTouchMoved, setOnTouchPressed, setOnTouchReleased, setOnTouchStationary, setOnZoom, setOnZoomFinished, setOnZoomStarted, setOpacity, setPickOnBounds, setPressed, setRotate, setRotationAxis, setScaleX, setScaleY, setScaleZ, setStyle, setTranslateX, setTranslateY, setTranslateZ, setUserData, setViewOrder, setVisible, snapshot, snapshot, startDragAndDrop, startFullDrag, styleProperty, toBack, toFront, toString, translateXProperty, translateYProperty, translateZProperty, usesMirroring, viewOrderProperty, visiblePropertyVon Klasse geerbte Methoden Object
clone, equals, finalize, getClass, hashCode, notify, notifyAll, wait, wait, waitVon Schnittstelle geerbte Methoden Styleable
getStyleableNode
-
Konstruktordetails
-
QuadGanttChartContainer
public QuadGanttChartContainer(GanttChart<?> upperLeft, GanttChart<?> upperRight, GanttChart<?> lowerLeft, GanttChart<?> lowerRight) Constructs a new container with the given Gantt chart controls.- Parameter:
upperLeft- the Gantt chart shown in the upper left positionupperRight- the Gantt chart shown in the upper right positionlowerLeft- the Gantt chart shown in the lower left positionlowerRight- the Gantt chart shown in the lower right position- Seit:
- 1.6
-
QuadGanttChartContainer
public QuadGanttChartContainer()Constructs a new container. Gantt charts must be added by callingQuadGanttChartContainerBase.setUpperLeftGanttChart(GanttChartBase)andQuadGanttChartContainerBase.setUpperRightGanttChart(GanttChartBase)andQuadGanttChartContainerBase.setLowerLeftGanttChart(GanttChartBase)andQuadGanttChartContainerBase.setLowerRightGanttChart(GanttChartBase).- Seit:
- 1.6
-